PrivacyNothing you type here is sent to us or saved by us. When you press Go, your question goes to the bot you picked, in a new tab, and that bot’s company handles it under its own privacy policy. Please don’t type personal details.For some bots we also copy your question to your clipboard so you can paste it. How this site handles data

Charts

AI data centers by the numbers

Data-center electricity figures from official agencies, plus announced AI data-center projects from Confirmed stories in our feed. Each chart lists its source and the date we checked it.

Checked Oct 11, 2026

Two kinds of numbers. The first charts are official national and global figures from the IEA, Lawrence Berkeley National Laboratory, the U.S. EIA and the European Commission, each checked on the agency’s own site. The charts after them compare individual project announcements from Confirmed stories in our feed: plans, not power in use today. See also Data centers.

Official national and global figures

Copied from each agency’s own page. Projections are labeled as projections; ranges show both ends.

Global data-centre electricity use (TWh)

IEA estimate for 2024 and its Base Case projection for 2030. IEA says 415 TWh is about 1.5% of global electricity use, and 945 TWh would be just under 3% in 2030.

2024 (estimate)
~415 TWh
2030 (IEA Base Case projection)
~945 TWh

Source (checked Oct 11, 2026): International Energy Agency (IEA), Energy and AI: Energy demand from AI

U.S. data-center electricity use (TWh)

Lawrence Berkeley National Laboratory’s 2024 United States Data Center Energy Usage Report, for the U.S. Department of Energy. 2023 was about 4.4% of U.S. electricity; 2028 is a range (6.7% to 12%).

2014
58 TWh
2023
176 TWh
2028, low end of LBNL range
325 TWh
2028, high end of LBNL range
580 TWh

Source (checked Oct 11, 2026): Lawrence Berkeley National Laboratory (U.S. DOE), Berkeley Lab Report Evaluates Increase in Electricity Demand from Data Centers

U.S. data-center servers, share of commercial-sector electricity (%)

U.S. Energy Information Administration, Annual Energy Outlook 2026. Servers alone (not cooling) were an estimated 7% of commercial electricity use in 2025; by 2050 EIA projects 22% to 33% depending on the case.

2025 (EIA estimate)
~7%
2050, lowest EIA case
22%
2050, highest EIA case
33%

Source (checked Oct 11, 2026): U.S. Energy Information Administration (EIA), Data center server energy use grows across the commercial building stock (May 19, 2026)

U.S. data-center server electricity in 2050, EIA range (billion kWh)

EIA’s Annual Energy Outlook 2026 projection for server electricity alone in 2050, across its cases (the high end is its High Electricity Demand case).

2050, lowest EIA case
446 BkWh
2050, highest EIA case
818 BkWh

Source (checked Oct 11, 2026): U.S. Energy Information Administration (EIA), Data center server energy use grows across the commercial building stock (May 19, 2026)

EU data-centre electricity use (TWh)

European Commission report COM(2026) 500 on the energy efficiency of data centres in the EU (Sept 21, 2026). It gives 68 TWh for 2024 and expects 114 TWh by 2030, 3.2% of EU electricity demand; the report cites the IEA for these figures.

2024
68 TWh
2030 (expected)
114 TWh

Source (checked Oct 11, 2026): European Commission (via the Council of the EU register), Report from the Commission on the energy efficiency of data centres in the EU, COM(2026) 500 final (Council doc. 13443/26)

Announced projects from our news feed

Announced AI data-center projects, planned power (MW)

Peak planned capacity, as each company or official announced it. These are plans, not power in use today.

Valar Atomics Project Beehive, Utah (applied)
9,600 MW
Meta Hyperion, Louisiana (Entergy)
4,500 MW
Google, Cheyenne WY (total supply)
2,700 MW
Applied Digital, Finland (up to)
1,000 MW
TeraWulf Muskie, Kentucky
1,000 MW
CX Tech Chapelcross, Scotland (applied)
~960 MW
Sesterce Jämsä, Finland (phase 2)
600 MW
JERA/Dell/RHAELM Chiba, Japan
400 MW
Sejong AI data center, Korea (MOU)
360 MW
AirTrunk TOK1, Japan
>300 MW
CoreWeave Navi Mumbai, India
240 MW
atNorth FIN05 Salo, Finland (path to)
230 MW

Sources (checked Oct 10, 2026): NPR · The Times-Picayune / NOLA.com · Black Hills Corp. (GlobeNewswire) · Applied Digital (GlobeNewswire) · TeraWulf (GlobeNewswire) · Planning Geek · Sesterce · JERA · Yonhap News Agency · Reuters (via The Star) · CoreWeave (Business Wire, via StockTitan) · atNorth (press release)

New power contracted for data centers (MW)

Power-supply deals tied to data centers, as the utilities and companies announced them.

Google + Constellation nuclear (PJM)
3,590 MW
Google renewables via DTE, Michigan
up to 1,600 MW
Black Hills grid power for Google
up to 590 MW
Oracle share of Point Beach nuclear (max 20%)
~120–240 MW

Sources (checked Oct 10, 2026): Constellation Energy · Michigan Public Service Commission · Black Hills Corp. (GlobeNewswire) · We Energies

When large power users face special grid rules (MW threshold)

The size at which a site falls under new large-load rules.

Texas PUC large-load rule
75 MW
Duke Energy NC settlement
50 MW

Sources (checked Oct 10, 2026): The Texas Dispatch · Duke Energy

EU data-center electricity use (TWh)

European Commission totals cited by POLITICO, which notes they come from incomplete data. The 2024 figure is our estimate, worked back from the reported 26% increase.

2024 (derived: 20.7 ÷ 1.26)
~16.4 TWh
2025 (Commission figure)
20.7 TWh

Sources (checked Oct 10, 2026): POLITICO