1.5%of global electricity used by data centers in 2024 (415 TWh, IEA)
945 TWhIEA Base Case projection for 2030 (a projection)
22%Ireland’s data-center share of metered electricity, 2024 (CSO)
5,427data centers in the United States, 2025 (Cloudscene via AI Index)

How a data center works

A data center is a building (or a campus of buildings) that houses the servers, storage and networking equipment that run online services, plus the power and cooling equipment that keeps them running. The IEA describes servers, storage and network equipment installed in racks, supported by cooling, uninterruptible power supplies, backup generators and other infrastructure.1

The IEA’s breakdown of where a data center’s electricity goes is below. The shares vary by facility; the IEA gives ranges, not a single split.

ComponentShare of data-center electricity (IEA)What it does
ServersAbout 60%Run the software. AI servers add GPUs and other accelerators, which draw far more power per machine.
StorageAbout 5%Disks and flash that hold data.
NetworkingUp to 5%Switches and links inside the building.
CoolingAbout 7% in efficient hyperscale sites; above 30% in less efficient enterprise sitesRemoves the heat that servers produce.
Power backup and otherRemainderUninterruptible power supplies, backup generators and other building systems.

Source for the table: IEA, Energy demand from AI.1

Types of data center

LBNL sorts U.S. data-center space into internal (in-house), enterprise, colocation (space rented to many customers), hyperscale (very large sites run by the biggest cloud companies), communications service provider and edge types.2 It reports that colocation and hyperscale facilities held 74% of U.S. server capacity in 2023 and projects 85% by 2028, and that the share of server energy used in internal data centers fell from over 60% in 2014 to nearly 10% in 2023.2

Measuring efficiency

Power usage effectiveness (PUE) is the ratio of a facility’s total energy to the energy used by its computing equipment; lower is better (glossary). LBNL reports an average U.S. PUE of about 1.6 in 2014 and 1.4 in 2023, and a projected range of 1.15 to 1.35 by 2028.2

How AI adds to power demand

The IEA reports that electricity use by accelerated servers (those with GPUs and similar chips, mostly for AI) grows about 30% a year in its Base Case, against about 9% for conventional servers.1 LBNL attributes the more-than-doubling of U.S. data-center electricity use between 2017 and 2023 largely to GPU-accelerated servers.2 The IEA says a typical AI-focused data center uses as much electricity as 100,000 households, and that the largest ones now under construction will use about 20 times that.3

LBNL estimates that inference (answering requests) accounted for nearly 60% of AI-server energy in 2023 and projects that training would account for 50–53% by 2028.2 The 2028 figure is a projection.

Power

Confirmed Measured or reported by statistics agencies and research labs. Projections are scenarios and are called out as such.

Worldwide

  • Data centers used about 415 TWh of electricity in 2024, about 1.5% of global electricity use.3
  • The United States accounted for 45% of that, China 25% and Europe 15%.3
  • Data-center electricity use has grown about 12% a year since 2017, more than four times faster than total electricity use.3
  • Projection: the IEA’s Base Case reaches about 945 TWh in 2030 (slightly more than Japan’s total electricity use today) and about 1,200 TWh in 2035, with a range of 700 to 1,700 TWh across its cases.3
  • The IEA puts data centers at roughly one-tenth of global electricity-demand growth to 2030.3
  • The IEA’s Base Case has data-center emissions rising from about 180 million tonnes of CO₂ to about 300 million tonnes by 2035, under 1.5% of energy-sector emissions.3

United States

  • LBNL: U.S. data centers used 176 TWh in 2023, 4.4% of U.S. electricity. That compares with 76 TWh (1.9%) in 2018.2
  • Projection: LBNL’s 2028 range is about 325 to 580 TWh, or 6.7% to 12.0% of U.S. electricity.2
  • Projection: the EIA’s AEO2026 estimates data-center servers at about 7% of commercial-sector electricity use in 2025 and 22% to 33% by 2050, depending on the case.4
  • The EIA found that growth in U.S. commercial electricity demand between 2019 and 2023 was concentrated in a few states, led by Virginia (+14 billion kWh) and Texas (+13 billion kWh).5

Concentration and the grid

  • The IEA reports that nearly half of U.S. data-center capacity sits in five regional clusters, and that about half of U.S. capacity now under development is in existing large clusters.3
  • The IEA estimates that about 20% of planned data-center projects worldwide could be delayed by grid constraints.3
  • Ireland: data centers used 6,969 GWh in 2024, 22% of the country’s metered electricity, up from 5% in 2015.6
  • Stanford’s AI Index 2026 estimates that AI data-center power capacity reached about 29.6 GW by the fourth quarter of 2025.7 That is an estimate built from chip data, not a metered figure.

Water

Water use has two parts. Direct use is water a facility itself consumes, mostly for cooling. Indirect use is water consumed by the power plants that supply its electricity. The USGS explains how “consumption” (water not returned to its source) differs from “withdrawal.”8

  • LBNL: direct water use by U.S. data centers rose from about 21.2 billion liters in 2014 to about 66 billion liters in 2023. Indirect water use associated with their electricity was about 800 billion liters in 2023.2
  • Projection: LBNL estimates direct water use by hyperscale data centers alone at 60 to 124 billion liters in 2028.2
  • Reported Google estimates that a median Gemini text prompt uses about 0.26 mL of water. Google says this has not been independently verified.9 See the bottle-of-water myth.
  • Reported Amazon says that from October to March its Project Rainier data centers in St. Joseph County, Indiana will not use water for cooling, and from April to September only for a few hours a day on an average day.10

Cooling design differs by site and climate, so one site’s figure does not predict another’s. The deeper explanation is on Is data-center water use just cooling?

Major sites and programs by country

Most announced figures are plans or company statements, not measurements, so they carry the Reported label. Capacity is quoted in the unit each source uses (gigawatts of power, not square feet) and should not be added across rows. This is a sample of widely documented projects, not a complete list.

CountrySite or programWhat the source saysLabelType
United StatesStargate, Abilene, Texas (OpenAI, Oracle, SoftBank)OpenAI said in Sept 2025 that the Abilene flagship site was up and running on Oracle Cloud, and that Stargate had nearly 7 GW of planned capacity and more than $400 billion of planned investment across its sites.11ReportedCompany announcement
United StatesMeta, Richland Parish, LouisianaMeta said in July 2026 that the site will expand to 5 GW of capacity, with an investment of more than $50 billion.12ReportedCompany plan
United StatesMicrosoft, Mount Pleasant, WisconsinMicrosoft said on June 23, 2026 that it had completed construction of its first data-center facility there.13ReportedCompany announcement
United StatesAWS Project Rainier, IndianaAmazon says the cluster uses nearly half a million Trainium2 chips and is used by Anthropic; St. Joseph County, Indiana is one of its sites.10ReportedCompany statement
IrelandNational totalData centers used 22% of metered electricity in 2024.6ConfirmedNational statistics
United KingdomAI Growth ZonesThe UK Government’s one-year review of its AI Opportunities Action Plan reports five AI Growth Zones, £28.2 billion of related investment and Isambard-AI in Bristol.14ReportedGovernment report
European UnionAI GigafactoriesThe Commission’s July 30, 2026 call covers up to seven AI gigafactories, with €10 billion of EU and national funding and at least €20 billion of private investment sought; the EU also counts 19 AI Factories.15ReportedGovernment call (plan)
ChinaEastern Data, Western ComputingIn Feb 2022 China approved eight national computing hubs and planned ten national data-center clusters, to move computing resources toward the less developed western regions.16ConfirmedGovernment program
IndiaGoogle AI hub, VisakhapatnamGoogle announced a $15 billion investment for a gigawatt-scale AI hub on Oct 14, 2025.17ReportedCompany announcement
United Arab EmiratesStargate UAE, Abu DhabiOpenAI said in May 2025 that the project is a 1 GW cluster, with the first 200 MW expected to go live in 2026; partners named are G42, Oracle, NVIDIA, Cisco and SoftBank.18 We have not confirmed that any of it is live.ReportedCompany plan
Saudi ArabiaHUMAIN (Public Investment Fund)The PIF launched HUMAIN on May 12, 2025 to operate across the AI value chain, including data centers.19 The release gives no capacity figure.ReportedGovernment-owned company
SingaporeNational policyThe Ministry of Digital Development and Information said on Sept 9, 2026 that a Digital Infrastructure Bill will mandate baseline sustainability standards for all data centers and that the government is reviewing whether more capacity is needed.20ConfirmedParliamentary reply

How many data centers, by country

Stanford’s AI Index 2026 reports data-center counts for 2025 compiled from Cloudscene.7 These are counts of facilities, not capacity: one hyperscale campus and one small server room each count as one, so the table says little about how much computing a country has. Only the countries the source lists are shown.

CountryData centers (2025)
United States5,427
Germany529
United Kingdom523
China449
Canada337
France322
Australia314
Netherlands298
Russia251
Japan222
Brazil197
Mexico173
Italy168
India153
Poland144

Myths vs facts

“AI is already using a huge share of the world’s electricity.”

The IEA puts all data centers (AI and everything else) at about 1.5% of global electricity in 2024.3 The growth rate is high, but the share is small today.

Confirmed

“Data centers will use the same share of electricity everywhere.”

Use is uneven. The U.S. share was 4.4% in 2023 per LBNL, and Ireland’s was 22% in 2024 per its statistics office.2,6

Confirmed

“The forecasts are settled.”

They are scenarios. The IEA’s 2035 range runs from 700 to 1,700 TWh, and LBNL’s 2028 U.S. range is 325 to 580 TWh.3,2

Confirmed

“Every AI question uses a bottle of water.”

The one published per-prompt measurement we found is a company estimate of about 0.26 mL for a Gemini text prompt, which Google says is not independently verified. See the myth page for the full discussion.9

Reported

“Data centers mostly use water that is lost for good.”

It depends on the cooling design. LBNL separates direct from indirect use, and Amazon says some of its sites use no cooling water for part of the year.2,10

Reported

“The newest data centers are all the same size.”

The IEA says a typical AI-focused data center draws as much power as 100,000 households and the largest under construction about 20 times that.3

Confirmed

Keep reading

What we left out. We did not include capacity figures we could not find on a primary page, and we did not rank countries by total data-center power because no single source we reviewed compares like with like. See How we verify; report an error through the corrections page.

Sources for this page

  1. Energy and AI: Energy demand from AI. International Energy Agency.Published April 2025 · checked Oct 3, 2026
  2. 2024 United States Data Center Energy Usage Report (LBNL-2001637). Lawrence Berkeley National Laboratory.Published Dec 2024 · checked Oct 3, 2026
  3. Energy and AI: Executive summary. International Energy Agency.Published April 2025 · checked Oct 3, 2026
  4. AEO2026 data-center electricity use (Today in Energy). U.S. Energy Information Administration.Projection, Annual Energy Outlook 2026 · checked Oct 3, 2026
  5. Commercial electricity demand growth (Today in Energy). U.S. Energy Information Administration.Published 2024 · checked Oct 3, 2026
  6. Data Centres Metered Electricity Consumption 2024: Key findings. Central Statistics Office (Ireland).Published June 10, 2025 · checked Oct 3, 2026
  7. AI Index Report 2026, Chapter 1: Research and Development (data-center counts, AI power capacity). Stanford Institute for Human-Centered AI.2026 edition; counts from Cloudscene (2025) · checked Oct 3, 2026
  8. Water Science School: Water-use terminology. U.S. Geological Survey.Current page · checked Oct 3, 2026
  9. Measuring the environmental impact of AI inference. Google Cloud Blog.Published Aug 21, 2025 · checked Oct 3, 2026
  10. AWS Project Rainier: AI compute cluster. Amazon (aboutamazon.com).Company statement · checked Oct 3, 2026
  11. OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites. OpenAI.Company announcement, Sept 23, 2025 · checked Oct 3, 2026
  12. Deepening our investment in Richland Parish, Louisiana. Meta (data center site).Company announcement, July 2026 · checked Oct 3, 2026
  13. Microsoft completes construction on first datacenter facility in Mount Pleasant, Wisconsin. Microsoft Source.Company announcement, June 23, 2026 · checked Oct 3, 2026
  14. AI Opportunities Action Plan: one year on. UK Government (gov.uk).Government publication, 2026 · checked Oct 3, 2026
  15. EU launches AI Gigafactories call. European Commission.Published July 30, 2026 · checked Oct 3, 2026
  16. China launches project for greater computing power, digital future (China Daily, hosted by NDRC). National Development and Reform Commission, China.Dated Feb 18, 2022 · checked Oct 3, 2026
  17. Our first AI hub in India, powered by a $15 billion investment. Google (blog.google, India).Company announcement, Oct 14, 2025 · checked Oct 3, 2026
  18. Introducing Stargate UAE. OpenAI.Company announcement, May 2025 · checked Oct 3, 2026
  19. HRH Crown Prince launches HUMAIN as global AI powerhouse. Public Investment Fund (Saudi Arabia).Press release, May 12, 2025 · checked Oct 3, 2026
  20. MDDI response to PQ on future data centre capacity plans in support of AI adoption. Ministry of Digital Development and Information (Singapore).Parliamentary reply, Sept 9, 2026 · checked Oct 3, 2026